District and geothermal heating hybrid heating as a total delivery from Gebwell

In 2016, a complete renovation and change in application were applied to the property originally built in 1969 at 15 Mäkipellontie Road.  Previously, district heating alone was used to heat the property.

The property’s heating system was renewed in connection with the renovation project. A district and geothermal heating hybrid system manufactured and delivered by Gebwell was installed in the property. Gebwell delivered every piece of equipment needed for this system, which merges geothermal and district heating in an all-in-one solution. In the summertime, the property is cooled by heat pumps via floor heating.

The site was supplied with:

  • a Gemini 40-kW heat pump,
  • a dual-circuit district heating substation
  • a detachable exchanger and two 1,000-litre special accumulators, one for heating and the other for cooling.